Skip or a crew on a Davidson street

A skip takes the builder's steady waste as the work goes. A crew takes whole items and roomfuls in one visit and leaves nothing behind. Which one fits depends on your street as much as the job, because a skip on the road needs Northern Beaches Council's approval first.

Two crew members carrying an old timber wardrobe in one piece down a steep concrete driveway, a brick house under renovation behind them and the footpath clear

A skip and a crew side by side

Neither is better across a whole renovation. They are good at different parts of it.

QuestionA skipA crew
Best at

Broken plaster, tile, timber offcuts and packaging, thrown in a bit at a time over weeks.

Whole cabinets, whitegoods, furniture and the contents of a room, taken in one visit.

Where it sits

On your drive, or on the verge or road outside for as long as it's hired.

Nowhere. We load from the rooms, the garage or the side path, then go.

Council approval

Needed for any container on the road, footpath or grass verge, with at least two working days to process.

No container application, because nothing is left on council land.

Who loads it

You and the trades, as you go.

We do, including the carry up a sloping drive or out from under the house.

Whole items

A cabinet or a lounge fills a skip fast unless someone breaks it up to fit.

Carried out whole, the way they came out of the room.

Neighbours

A 1.5 metre path kept clear past it the whole time it's out.

The truck parks while we load, then leaves with everything on it.

The price

Hire by bin size and weeks, plus the council's fees if it goes on the street.

One fixed price for each load, agreed after we've seen it.

What your street leaves room for

Away from Sir Thomas Mitchell Drive, most Davidson streets are short cul-de-sacs and crescents, and plenty of houses sit on sloping blocks with the garage underneath. Once a renovation starts, the drive is often where the trades park.

The drive still has room

A skip that sits wholly on your drive is on your own land, so the council's container application doesn't apply to it. Check with the builder that it won't block their vans or deliveries.

A skip on the drive, and a crew for the whole items.

The drive is full, the kerb is straight

A skip on the verge or road can work if there's a clear stretch of kerb away from the neighbours' driveways. It needs the council's approval before it's delivered, and a 1.5 metre path kept open past it.

A skip on the street with approval, or a crew each time a load is ready.

A turning circle or a short close

The kerb curves, the driveways sit close together and every car turns round in front of you. A six-metre container may not have anywhere clean to go, and the neighbours share whatever space there is.

A crew that loads and leaves.

Northern Beaches Council's approval for a skip on the street

Davidson is in the Northern Beaches Council area. The council calls a skip a building waste container, and any container placed on its land, including the road, the footpath and the grass verge, needs an approved application first.

Where a skip can sit outside a house A plan view: the property boundary, then a strip 1.5 metres wide kept clear for people walking, then the container on the verge beyond it, up to 6 metres long and 2 metres wide, with lights or reflectors at its corners, then the kerb and the road. Drive Your block Path kept clear 1.5 m Container Verge 6 m long, 2 m wide at most ROAD
Up to 6.0 metres long, 2.0 metres wide and 1.5 metres high. The council won't approve a bigger one.

Put it out first and apply later? The council charges a late fee on an application lodged after the skip is already out, and it may not accept the application at all. Changing the dates means telling the council at least one working day before, and the new dates have to fall within two weeks of the approved ones.

What the application asks for

  • The skip supplier's details, the bin's size and the dates it will be out
  • A site plan and a photo showing driveways, parking signs and any traffic calming
  • A certificate of public liability insurance with the council named on it
  • A signed indemnity for the council
  • The council's fees: an application fee that covers the first seven days, then a weekly fee after that

While the skip is out

  • The approval letter stays on site for a council officer to see
  • A path at least 1.5 metres wide stays clear between your boundary and the skip
  • The bin carries warning lights or reflectors, and the supplier's name and after-hours number
  • No food scraps, chemicals or other hazardous waste goes in a skip on the street
  • If it blocks a neighbour's access, they get two working days' written notice first

Working out the lead time

Processing takes at least two working days, and weekends and public holidays don't count. Skips can't be delivered before 7am on a weekday or 8am on a Saturday, or at all on a Sunday or public holiday. For a skip on a Monday morning, the application goes in by the Wednesday before.

  1. WedApplication in
  2. ThuWorking day one
  3. FriWorking day two
  4. SatNot counted
  5. SunNo deliveries
  6. MonSkip out from 7am, letter in hand

Using a skip and a crew on the same renovation

On a kitchen, a bathroom or a whole level, the builder's skip and our loads usually split the work between them.

  1. 1 Before the trades

    We empty the rooms

    The skip often hasn't arrived yet, and furniture and boxed contents don't belong in one anyway.

    • Beds, wardrobes and lounges that aren't staying
    • Boxed contents from cupboards and shelves
    • The old fridge or table the new room replaces
  2. 2 During

    The skip takes the rubble, we take the fittings

    Plaster, tile and offcuts go in the skip as they're made. The cabinets, vanity, bath and old appliances come to us whole, so they don't eat the skip's space.

    • Cabinets, benchtops and the sink in one piece
    • Vanity, toilet, bath and shower screen
    • Carpet and underlay once it's up
  3. 3 After handover

    We clear what's left once the skip goes

    The skip usually leaves with the builder. What turns up after that has nowhere to go.

    • Appliance boxes and flat-pack cardboard
    • Offcuts the trades left behind
    • Furniture the finished room no longer suits
An under-house garage mid-renovation: bagged plaster, broken board and timber offcuts on a tarp on one side, and an old kitchen cabinet, a fridge, a chair and a rolled carpet set apart whole on the other
Two kinds of rubbish in one garage. The broken board, offcuts and bagged tile on the tarp are what a skip is for. The cabinet, fridge, chair and carpet are whole items that take up a lot of a skip and come out easily in one crew load. Keeping the two apart as the work goes makes both jobs quicker.

How each one is priced

Skip hire is usually priced by the size of the bin and how long you keep it, and heavy material can change that. On the street, the council's application fee covers the first seven days and a weekly placement fee applies after that, so a skip that stays out while the job runs late costs more each week.

We price each load once we've looked at it, and that price doesn't move unless you add to the load. There's no clock running while we carry, no tip fee added at the end and no council fee, because nothing of ours stays on the street.

What changes a crew's price

How much
How much of the truck it takes up.
What it is
Whitegoods, tiles and heavy material cost more to dispose of.
The carry
Stairs, a steep drive or a garage under the house.
How many visits
One load or three, as the job needs.
Old sheeting doesn't go in the skip or on our truck

The NSW EPA counts any house built before 1990 as likely to contain asbestos. Eaves linings, the sheeting behind old bathroom tiles and old vinyl with its backing are the places a renovation tends to disturb, so get them tested before anything is pulled off.

Bonded asbestos over 10 square metres, and friable asbestos in any amount, is a job for a licensed asbestos contractor, and asbestos.nsw.gov.au sets out how to find one. The skip and our loads both wait until they are done. What to test first

Questions about skips and crews

Does a skip on the nature strip need approval too?

Yes. The council's application covers the road, the footpath and the grass verge alike. Only a skip sitting wholly on your own drive falls outside it.

Who lodges the application, me or the skip company?

Ask the skip company when you book whether they lodge it for you. Either way the application needs the supplier's details, a site plan and photo, and a public liability certificate naming the council.

Can the old kitchen go in the builder's skip?

If there's room, yes. Whole cabinets take up a lot of a skip, though, and breaking them up to fit is time the trades bill you for. We can take them in one piece on the day they come out.

The skip is full and the next one isn't due yet. Can you take the overflow?

We can take what's piled beside it, so the drive or garage is clear again. Tell us roughly what's there and we'll price it before we load.

Can a skip be delivered on the weekend?

On a Saturday from 8am, if the approval is through. The council's conditions don't allow a skip to be delivered on a Sunday or a public holiday.

Won't the council bulky goods collection take some of it?

Not the renovation part. The collection leaves out building material, and takes only one built-in item, so a kitchen or bathroom needs a skip, a crew or both.

Our street is steep. Does that matter for a crew?

It changes how long the carry takes, and that's in the price we give you before we start. Tell us if the load is under the house or the drive is shared.


More on renovation clearing

Sources

  1. Building Waste Container (Skip Bin) Application, form 4051, 2026/2027Northern Beaches Council. Size limits, processing time, delivery hours, the 1.5 metre path, fees and conditions.
  2. Building waste containers (skip bins)Northern Beaches Council help page.
  3. What we can and can't collectNorthern Beaches Council, bulky goods collection.
  4. Dealing with household asbestosNSW EPA.
  5. Asbestos in the homeasbestos.nsw.gov.au.

Tell us about the job

A few lines is plenty. We ring you back, come and look at it, and agree one fixed price before anything is lifted.

No hourly rate, no tip fees on top. The price covers loading, sweeping up and taking it to a licensed facility. If the job changes on the day, we agree the change before we carry on.