Rubbish removal in Davidson, before, during and after your renovation

We clear the rooms before the trades arrive, take what they pull out, and clear up after handover. One fixed price, agreed first.

An emptied room, the floor swept, the back wall stripped to new pine framing and the first sheet of wet-area board leaning against it
  1. Before the trades 1 Rooms emptiedFurniture and contents out before the trades' start date.
  2. During Trades on site2 What comes outThe old kitchen, the bathroom, carpet and deck boards, as they come out.
  3. After handover 3 Leftovers clearedOffcuts and packaging, gone once the trades hand over.

Three loads, booked around the trades

A renovation doesn't produce one pile. It produces three, at three different times, and the trades are paid by the day while they wait for a clear room.

  1. 1

    Empty the rooms

    We take everything that isn't staying out of the rooms being worked on, before the start date.

    • Old furniture, beds and lounges
    • Cupboard and pantry contents you're done with
    • The fridge or table the new kitchen replaces
  2. 2

    Take what comes out

    When the old kitchen or bathroom comes out, we take it on a day booked around the installer, before it fills your garage.

    • Cabinets, benchtops, sinks and rangehoods
    • Vanities, toilets, screens and baths
    • Carpet, underlay and old deck boards
  3. 3

    Clear the leftovers

    Once the trades hand over, we take the offcuts and packaging and anything else the new room has retired.

    • Offcuts, trims and tile boxes
    • Appliance and flat-pack packaging
    • The old pieces that don't fit the new room

Loaded, swept and gone each time. How renovation clearing works

Plan your loads

Three questions. You'll see where your job sits, what's still to come out, and what we'll need from you.

What's being redone?

Pick any that apply.

Where is the job up to?
Is there a builder's skip on site?

Pick what's being redone and where the job is up to.

Old eaves sheeting or vinyl underlay? Get it tested first.

The NSW EPA says a house built before 1990 probably contains some asbestos. Going by when the suburb was built, many houses around here are that old. If a renovation will disturb eaves linings, wet-area wall sheeting or old vinyl and its backing, have it tested before anyone touches it.

We don't remove asbestos. A licensed asbestos contractor does, and we'll happily work around their visit. What to test, and who does what

The rest of what we take

Not every job is a renovation. Same crew, same fixed price agreed first.

We work in Davidson and the suburbs around it: Frenchs Forest, Forestville, Belrose, St Ives, St Ives Chase, East Killara and Killara. Where we work

Tell us about the job

A few lines is plenty. We ring you back, come and look at it, and agree one fixed price before anything is lifted.

No hourly rate, no tip fees on top. The price covers loading, sweeping up and taking it to a licensed facility. If the job changes on the day, we agree the change before we carry on.

We use your details to ring you back about this job. If another local crew is better placed to do it, we may pass it to them. No mailing list.